RIBA Stage 6
Handover
Hand over the building, conclude the building contract, and provide aftercare services.
In Practice
- Assist with snagging list preparation
- Compile O&M manual contents
- Prepare as-built drawing updates
- Help with building user guide
- Coordinate defects liability period items
- Organise project archive
For Students
- Prepare final presentation boards
- Write a project evaluation report
- Document lessons learned
- Compile portfolio for submission
- Reflect on design vs. brief alignment
- Prepare for final crit / viva
Tools Commonly Used
InDesignWordPowerPointAdobe Suite