RIBA Stage 6

Handover

Hand over the building, conclude the building contract, and provide aftercare services.

In Practice

  • Assist with snagging list preparation
  • Compile O&M manual contents
  • Prepare as-built drawing updates
  • Help with building user guide
  • Coordinate defects liability period items
  • Organise project archive

For Students

  • Prepare final presentation boards
  • Write a project evaluation report
  • Document lessons learned
  • Compile portfolio for submission
  • Reflect on design vs. brief alignment
  • Prepare for final crit / viva