Back to Plan of Work

RIBA Stage 5

Manufacturing & Construction

Manufacture building systems and construct the building on site.

In Practice

  • Issue construction-stage drawings
  • Respond to contractor RFIs
  • Attend site visits and inspections
  • Review shop drawings and submittals
  • Prepare site visit reports
  • Manage drawing revision register

For Students

  • Build a physical model or 1:1 prototype
  • Document construction sequence
  • Study real construction site processes
  • Understand contractor coordination
  • Research prefabrication methods
  • Prepare construction methodology report

Tools Commonly Used

RevitBIM 360ProcoreExcelAdobe Suite