Back to Plan of Work
RIBA Stage 5
Manufacturing & Construction
Manufacture building systems and construct the building on site.
In Practice
- Issue construction-stage drawings
- Respond to contractor RFIs
- Attend site visits and inspections
- Review shop drawings and submittals
- Prepare site visit reports
- Manage drawing revision register
For Students
- Build a physical model or 1:1 prototype
- Document construction sequence
- Study real construction site processes
- Understand contractor coordination
- Research prefabrication methods
- Prepare construction methodology report
Tools Commonly Used
RevitBIM 360ProcoreExcelAdobe Suite