ADBActivity DataBaseacronym

Software used to manage room data on hospital projects — every room has a defined list of equipment from MRI machines to soap dispensers.

AIApproved Inspectoracronym

Private body certified to provide building control services.

ARBArchitects Registration Boardacronym

The UK's statutory regulator of the architect profession.

Article 4 Direction

term

Removes permitted development rights in a defined area.

As-Builts

term

Drawings produced after completion showing what was actually constructed, accounting for on-site changes.

Baluster

term

Vertical member of a balustrade supporting a handrail.

BCOBuilding Control Officeracronym

Person responsible for checking compliance with Building Regulations.

BIMBuilding Information Modellingacronym

Digital process for creating and managing building data.

Blue Line Boundary

term

A line on a site plan showing other land owned by the applicant nearby that is not part of the current application.

BREEAMBuilding Research Establishment Environmental Assessment Methodacronym

Widely used sustainability assessment for buildings.

Building Envelope

term

The physical separator between the conditioned (heated) interior and the exterior — the building's 'shell'.

CADComputer-Aided Designacronym

Software used to create drawings. In the UK usually refers to 2D drafting (e.g. AutoCAD), whereas BIM refers to 3D data-rich modelling.

CDMConstruction (Design and Management) Regulations 2015acronym

Regulations imposing health and safety duties on clients, designers and contractors.

CIATChartered Institute of Architectural Technologistsacronym

Professional body representing architectural technology.

CILCommunity Infrastructure Levyacronym

A charge on new development to fund local infrastructure.

Cill (Sill)

term

The horizontal member at the base of a window or door.

Cladding

term

An additional outer layer on a building used for insulation or aesthetics (timber, metal, brick slips, etc.).

Cold Bridge

term

Localised area of higher heat loss through a building element.

Conservation Area

term

Designated area of special architectural or historic interest.

Coping

term

The protective top course of a wall or parapet, shedding water.

Course

term

A single horizontal layer of units, such as bricks or stones, in a wall.

CPDContinuing Professional Developmentacronym

Regular training architects must do to keep their skills current. RIBA chartered members typically need 35 hours per year.

Curtain Wall

term

Non-loadbearing external wall, usually framed and glazed.

Curtilage

term

The land immediately surrounding a house, including garden and outbuildings. Important for permitted development calculations.

D&BDesign and Buildacronym

Procurement route where the contractor takes over the design and hires their own consultants. Common in the UK.

DASDesign and Access Statementacronym

Document accompanying major planning applications explaining design rationale.

Defects Liability Period

term

Period (usually 12 months) after PC during which the contractor remedies defects.

DERDwelling Emission Rateacronym

Actual CO₂ emissions per m² per year for a proposed dwelling.

Dormer

term

A window that projects vertically from a sloping roof, creating extra headspace and light in a loft.

DPCDamp-Proof Courseacronym

Barrier preventing rising damp in masonry walls.

DPMDamp-Proof Membraneacronym

Sheet barrier preventing moisture rising through floors.

Eaves

term

The edges of the roof which overhang the face of a wall, designed to throw water clear of the building.

EPCEnergy Performance Certificateacronym

Rating of a building's energy efficiency from A to G.

Facade

term

The principal front of a building that faces onto a street or open space.

Fascia

term

Vertical board fixed to the ends of rafters at the eaves.

Feasibility Study

term

Early-stage report (RIBA Stage 0–1) testing whether a project is viable — planning constraints, daylight, basic massing.

Fenestration

term

The arrangement, proportion and design of windows and doors in a building.

FFLFinished Floor Levelacronym

The level of the finished walking surface, including floor finishes.

Gable

term

The triangular portion of a wall between the edges of intersecting roof pitches.

GEAGross External Areaterm

Floor area measured to the external face of perimeter walls.

GIAGross Internal Areaterm

Floor area measured to the internal face of external walls.

Going

term

The horizontal depth of a stair tread (nosing to nosing).

GRIPGovernance for Railway Investment Projectsacronym

The previous standard for managing UK rail projects, split into Stages 1–8.

IFCIndustry Foundation Classesacronym

Open file format used to exchange BIM data.

ISOInternational Organization for Standardizationacronym

Seen on title blocks (e.g. ISO A1). Sets standards for paper sizes, drawing layers and much more.

JCTJoint Contracts Tribunalacronym

Publisher of standard form construction contracts in the UK.

Lintel

term

A horizontal beam spanning the opening of a window or door to support the wall above.

Listed Building Consent

term

Consent required to alter or extend a listed building.

LPALocal Planning Authorityacronym

The local council body responsible for determining planning applications.

M&EMechanical and Electricalacronym

Engineers who handle the 'guts' of the building — heating, ventilation, wiring, and plumbing.

Massing

term

The overall three-dimensional form, size and shape of a building.

MEPMechanical, Electrical and Plumbingacronym

Building services disciplines.

Mullion

term

Vertical member separating window panes or openings.

MVHRMechanical Ventilation with Heat Recoveryacronym

Ventilation system that recovers heat from extract air.

NBSNational Building Specificationacronym

UK system for writing construction specifications.

NDSSNationally Described Space Standardacronym

Optional minimum internal floor area standard for new homes in England.

NECNew Engineering Contractacronym

Family of construction contracts used widely in public sector projects.

Newel

term

The principal post at the foot, head or turn of a stair.

NIANet Internal Areaterm

Usable area excluding cores, columns and circulation.

NPPFNational Planning Policy Frameworkacronym

England's overarching planning policy document setting out government policy.

OSOrdnance Surveyacronym

The UK's national mapping agency.

Parapet

term

Low wall extending above a roof edge to provide protection and conceal the roof.

PCPrincipal Contractoracronym

The main builder in charge of the site and all the subcontractors.

PDPermitted Developmentacronym

Rights to extend or alter a building without a full planning application.

PEDRProfessional Experience and Development Recordacronym

The quarterly logs Part 1 and Part 2 students complete to record practical experience toward the Part 3 exam.

Pitch

term

The angle or slope of a roof or stair from horizontal.

Plinth

term

A projecting base of a wall or column.

POEPost-Occupancy Evaluationacronym

Systematic review of a building's performance once in use.

Pointing

term

The finished mortar between bricks. When it weathers away a wall needs re-pointing to stay watertight.

Practical Completion

term

Stage when works are complete enough for the client to take possession.

Psi-Value (Ψ)

term

Linear thermal transmittance at a junction (W/mK).

QAQuality Assuranceacronym

The internal office process of checking drawings before they are issued to make sure there are no typos or missing dimensions.

QSQuantity Surveyoracronym

The person who manages the project costs. They make sure the design doesn't outpace the budget.

Red Line Boundary

term

The exact site border as registered with the Land Registry. Drawn as a solid red line on a site plan; anything outside it is not part of the application.

Render

term

External plaster finish applied to walls. Can be smooth, textured or pebbledash.

Reveal

term

The side of a window or door opening between the frame and the external wall face.

RFIRequest For Informationacronym

Contractor's formal query requesting design clarification.

RIASRoyal Incorporation of Architects in Scotlandacronym

Professional membership body for architects in Scotland.

RIBARoyal Institute of British Architectsacronym

Professional body for architects in the UK; publishes the RIBA Plan of Work.

Rise

term

The vertical height between consecutive stair treads.

S106Section 106 Agreementacronym

A planning obligation under the Town and Country Planning Act used to mitigate development impacts.

SAPStandard Assessment Procedureacronym

UK methodology for calculating energy performance of dwellings.

Sash Window

term

Traditional British window made of one or more movable panels (sashes) that slide vertically.

SBEMSimplified Building Energy Modelacronym

Methodology for calculating non-domestic building energy performance.

Screed

term

A cement-based layer laid over a floor base to create a smooth, level surface for the final finish.

Section 73

term

Application to vary a condition attached to a planning permission.

Setting Out

term

The process of marking the exact positions of walls and features on the ground so contractors know where to build.

Snagging

term

Identifying and rectifying defects in a completed building.

Soffit

term

The underside of an architectural element (e.g. eaves, beams).

SSLStructural Slab Levelacronym

The level of the top of the structural slab, before finishes.

Stringer

term

The diagonal structural member supporting stair treads at the side.

SUDSSustainable Urban Drainage Systemsacronym

Drainage strategy mimicking natural water management to reduce runoff.

Tender

term

Formal invitation for contractors to bid for construction work.

TERTarget Emission Rateacronym

The maximum permitted CO₂ emission rate for the dwelling under Part L.

TPOTree Preservation Orderacronym

An order made by the council to protect specific trees. If a tree has a TPO, you usually can't touch it without special permission.

Transom

term

Horizontal member dividing a window or above a door.

U-Value

term

Rate of heat transfer through a building element (W/m²K). Lower is better.

Vapour Barrier

term

Thin membrane preventing moisture from internal air migrating into the wall build-up and causing rot.

VATValue Added Taxacronym

20% UK tax — most new-build housing is zero-rated, alterations are usually standard-rated.

Vernacular

term

Architecture using local materials and traditional techniques — e.g. a Cotswold stone cottage.

Void

term

An empty space or large opening between floors, often used to create a sense of height.